TRAINING CATERING UNIT PROJECT Interim Report / September 2025 – March 2026
Since October 2025, the kitchen has been fully operational and has evolved over the past six months into a structured and resilient unit, capable of maintaining high-quality production despite challenging conditions. The IMS Training Catering Unit in Maad–Jbeil operates...